Project Description

*community wind park near Norwood, Ontario

For more info:    CollieHill@zeroemissionpeople.com

  • 3 windmills integrated into the vast and hilly landscape
  • zero emissions – clean power off-sets the carbon footprint of 500 people every year
  • 20 year power contract for 10 MW awarded by Ontario Power Authority
  • current status: permitting

 

DOWNLOAD Wind Farm Collie Hill Could power all homes in AN_28March2013

DOWNLOAD Wind Farm Collie Hill – REA studies summary and FAQ – 20Feb2013

DOWNLOAD 01 – DRAFT Collie Hill Project Description Report 2012-11-16

DOWNLOAD 02 – DRAFT Collie Hill Construction Plan Report 2012-11-16

DOWNLOAD 03 – DRAFT Collie Hill Decommissioning Plan Report 2012-11-16

DOWNLOAD 04 – DRAFT Collie Hill Design and Operations Report 2012-11-16

DOWNLOAD 05 – DRAFT Collie Hill Noise Impact Assessment Report 2012-11-16

DOWNLOAD 06 – DRAFT Collie Hill NHA and EIS – 2012-10-17

DOWNLOAD 07 – Collie Hill NHA Confirmation Letter – 2012-10-18

DOWNLOAD 08 – DRAFT Collie Hill Water Bodies Assessment Report 2012-11-16

DOWNLOAD 09 – DRAFT Collie Hill Water Bodies Impact Assessment Report 2012-11-16

DOWNLOAD 10 – DRAFT Collie Hill Turbine Specifications Report 2012-11-16

DOWNLOAD DRAFT Collie Hill FINAL Public Meeting Notice_2012_11_26 Meeting and date change

Project update – cancelation 28.3.2013 – Noise Crystallization

1. DOWNLOAD Notice of Draft Site Plan

2. DOWNLOAD Draft Site Plan

3. DOWNLOAD Appendix to Draft Site Plan – Description of Map Features

4. DOWNLOAD Appendix to Draft Site Plan – Noise Receptors

5. DOWNLOAD Draft Environmental Noise Impact Report